Public Works Minister Mr. Ali Mareehaan today inspected the ongoing repairing work of Burao’s main Bridge as well as the existing condition of the old Burao bridge. The minister who inspected flood-damaged bridge has said that the repairs to the bridge were progressing well.
The minister has urged the engineer who is repairing the old bridge to give the bridge strong foundation. The engineer has promised to finish the repair work on time.